The smaller the resistivity of the powder, the easier the powder particles to release charge, the less adsorption force and easy to fall off. Therefore, the higher the resistivity of the powder, the easier the saturation of the coating is. The volume resistivity of the coating is planned in the range of 109-1013 Ω· cm. The distance between the head of the spray gun and the workpiece is generally 150-200 mm. The interval, viewpoint and moving speed of the spray gun should be consistent. The initial increase rate of the film thickness is directly proportional to the powder supply. After a certain period of spraying, the film thickness increases slowly. When the powder supply is increased, the accumulation is reduced to increase the recovered powder. Generally, the powder output is 70-120g / min It is suitable for the powder to be in uniform mist.
Compensation for coating defects after spraying,
If there is a defect, the coating should be wiped off and re sprayed, or special tools (such as knife) should be used to evenly spread the powder coating on the defect of the coating for industrial aluminum profile to melt it. If the workpiece has been confirmed, it can be used.
(1) The coating thickness of 100-300 μ M can be obtained by powder coating once, while the general coating needs 4-8 times of application, so the power of construction can be advanced and the production cycle can be shortened.
(2) There is no solvent in the coating, no need to dilute and adjust the viscosity, which changes the working conditions and reduces the risk of fire, which is conducive to the protection of the environment.
(3) The adhesion and compactness of the coating are improved. The mixed coating of metal powder and ceramic powder can advance the mechanical and physical functions of the coating and the anti-corrosion function of the coating.
(4) It has high mechanization and can recover the excessive coating, which reduces the consumption of coating.
(5) The coating equipment is disordered and the capital cost is high. The appearance and leveling property of the coating are not as good as those of the spraying method. Some powder coating methods have requirements on the shape and scale of the workpiece. It can only be used for powder coating, and the cost is high.
Source: Jiangmen spray processing factory
07-22
Preparation and routine maintenance before using coating equipment
Before coating construction, the operator should know what preparation and daily protection should be done, otherwise the equipment will be damaged. Preparation before painting Before the coating
07-22
How to deal with the phenomenon that powder coating does not produce powder
1、 There are other impurities in the powder coating 2、 If the spray gun and powder feeder are not cleaned up for a long time, there is powder sticking on the nozzle end, and the powder outlet of the spray gun is blocked by the loose head 3、 The powder itself is damp and caking 4、 During construction, the air pressure is too low 5、 The solenoid valve doesn't work and there is no powder injection pressure output 6、 The powder conveying pipe connecting the spray gun is bent and may fa
07-22
Characteristics of Jiangmen spraying equipment
The smaller the resistivity of the powder, the easier the powder particles to release charge, the less adsorption force and easy to fall off. Therefore, the higher the resistivity of the powder, the
07-22
Advantages of Jiangmen powder coatings
1. Excellent film function The coating has metallic luster, brilliant multicolor effect and outstanding protection function, which provides colorful appearance decoration for industrial products su